Conservation and building renovation project. Supply and installation of:
165 sqm of ground-floor shopfronts in galvanised steel SECCO EBE 85, bronze-painted, with extra-clear insulated glazing 66.2/16/66.2
200 sqm of window systems with SECCO EBE85 profiles for the upper floors
600 sqm of REYNAERS SLIM 38 window systems painted RAL 7016, in various configurations (fixed, single- and double-leaf opening, including four motorised smoke-extraction units), with selective glazing
20 sqm of EI60 fire-resistant window systems made with Reynaers CS77 FP profiles
1,600 sqm of M+T façade with pressure plate and cover cap, using the same selective glazing as the window systems, in bronze-oxidized aluminium finish